NFPA 110 / 99 / 101 · Emergency Power Compliance

Find your K-tag gaps
before the surveyor does.

Submit your facility info below. We pull your CMS citation history, cross-reference against NFPA 110, 99, and 101 requirements, and deliver a prioritized gap report in 72 hours — no site visit required.

72 hr
Delivery
$299
Flat fee
8
Deliverables
0
Site visits
Step 1 of 4 — Facility Information
Facility information

Used to pull your CMS inspection record and identify applicable NFPA requirements.

Skilled Nursing Facility (SNF)Medicare/Medicaid certified — CMS annual survey
Assisted Living Facility (ALF)State-licensed — state health department survey
Combined SNF + ALF campusBoth Medicare-certified and assisted living on site
OtherICF, PACE, adult day, or other LTC setting
No payment yet
Emergency power systems

Honest answers produce an accurate gap analysis. There are no wrong answers here.

Why this mattersNFPA 110 requirements vary by generator type and classification. Your answers determine which testing intervals and documentation standards apply.
Yes — 1 generator
Yes — 2 or more generators
No generatorMay be required under NFPA 99/101 — we'll flag this
Not sure
Within the last 30 days
1–3 months ago
3–6 months ago
More than 6 months agoNFPA 110 requires monthly 30-min tests — likely a gap
Not sure / no records available
Yes — within the last 12 months
Yes — more than 12 months ago
No — never doneCommon gap — we'll flag the specific NFPA 110 requirement
Don't know
Monthly test logs
Transfer switch tests
Fuel quality / tank log
Coolant / battery records
Manufacturer service records
None of the above
Life safety & survey history

Prior citation history is the fastest signal of where your gaps are. Confidential — used only to build your report.

Less than 6 months ago
6–12 months ago
More than 12 months agoSurvey is likely approaching — high urgency
Not sure
Yes
No
Not sure / don't have access to results
Generator / EPSS docs
Transfer switch
Sprinkler system
Fire alarm / NFPA 72
Emergency lighting
Means of egress
Electrical separation
None known
Contact & delivery

Your report will be delivered as a branded PDF to the email below within 72 hours of payment confirmation.

Order total$299
EPSS Compliance Gap Report$299
CMS citation history — 3 survey cyclesincluded
NFPA 110 / 99 / 101 gap analysisincluded
Prioritized risk matrix + readiness scoreincluded
Plain-English corrective action summaryincluded
Branded PDF — 72-hour deliveryincluded
Standard — 72-hour delivery ($299)
Priority — 24-hour delivery ($398)Recommended if survey window is within 90 days
Secure checkout via Stripe
One-time charge — no subscription
PDF delivered to your inbox
Money-back if no gaps found
Something went wrong — please try again. If the issue persists, email hello@uptimecompliance.com.

Order confirmed.

Your EPSS Compliance Gap Report is being generated. Expect delivery at within 72 hours.

Now
Confirmation sent — check your inbox for order details.
1–4 hr
CMS data pull initiated — inspection history retrieved from CMS CASPER.
4–24 hr
Gap analysis compiled — cross-referenced against NFPA 110, 99, and 101.
72 hr
Report delivered — branded PDF with risk matrix, readiness score, and corrective actions.